Project and Progress Payment Agent

What was built on site is what the progress payment says.

At a time when costs rise every month and several sites run at once, it reads the work programme, the quantities, the progress payment and the contract terms side by side, and tells you about work falling behind and payments running late before anyone asks.

At this pace, where do we finish?

  1. Reads programme: Takes the planned course of the work from the work programme
  2. Adds quantities: Places the work done on site over the programme
  3. Finish slips: At today’s pace, the expected finish moves past the contract completion date
  4. Progress status: Reaches the project manager together with its evidence

The current picture

Costs are racing; the work programme is slipping.

Material prices change every month, the price adjustment calculation is being redefined and several sites run at once. While the work programme sits in one file, the quantities in the site diary and the progress payment in a spreadsheet, a delay is often noticed only in the last months of the contract.

  • Construction costs showed their fastest annual rise in twenty-one months; the sharpest increase was in non-building works such as roads and infrastructure.

    Turkish Statistical Institute (TÜİK), Construction Cost Index · September 2026

    The agent’s answerProject budget and cost at completion
  • Türkiye’s Public Procurement Board redefined which consumer price index series is used for the labour input in price adjustment for construction works.

    Public Procurement Board (KİK) decision 2026/DK.D-332 · 30 September 2026

    The agent’s answerProgress payment draft
  • Housing and social facility construction is under way at the same time on more than a thousand sites of Türkiye’s Housing Development Administration.

    Housing Development Administration (TOKİ), presentation to the State-Owned Enterprises Committee of the Grand National Assembly · 20 October 2026

    The agent’s answerProgress and work programme
  • In the first half of the year, more than half of tendered public procurement went to construction works; municipalities were the largest buyers.

    Public Procurement Authority, 2026 First Six Months Public Procurement Monitoring Report · September 2026

    The agent’s answerChecking the incoming progress payment

Product film

Meet the Project and Progress Payment Agent.

Watch, in a short film, how a work item is followed from the site diary to the progress payment, and from the progress payment to approval.

The film is narrated in Turkish.

What the agent does

Six answers to “Are we on programme?”, “Is this progress payment right?” and “How close are we to the variation limit?”

Behind it, ERP, document, communication and meeting agents read the work programme, the quantities, the progress payment reports, the correspondence and the minutes of site meetings; the legal agent reports the contract clauses on time, penalties, advances and price adjustment. You get a status table by project and the progress payment and letter drafts awaiting your approval.

Progress and work programme

It compares actual quantities and the daily site report with the work programme, item by item. It shows the delayed items on the critical path, the time left to contract completion and the approved extensions of time in the same table; it keeps a delay the contractor has reported in correspondence apart, labelled “reported”. If the work programme is not digital, it does not invent days of slippage; it writes “no programme”.

What you gainYou learn of a delay in the week a work item starts falling behind; no surprise is left for the end of the contract.

Project budget and cost at completion

After every month-end close it compares the project budget, item by item, with actual cost, orders already placed and price adjustment. It works out earned value, the budgeted value of the work done; it forecasts what the work will cost to finish at this pace and this cost, and shows the difference against budget. It reports a trend towards overrun to the Early Warning and Risk Agent.

What you gainYou see a budget overrun before the project ends, while there is still time to act.

Progress payment draft

On the contractor’s side, at the end of the payment period it takes quantities from the measurement book and its measurement sheets, and calculates the cumulative and period value of work using the contract unit rates and previous progress payments. It applies price adjustment, advance recovery, retention, delay penalties and taxes line by line according to the contract, and puts the net amount into the draft with its basis. It marks a period whose index has not yet been published as “provisional index” and an item with no unit rate as “unpriced”. It follows the approval and payment of a submitted progress payment against the periods in the contract; once a period is exceeded, it drafts a reminder letter to the employer.

What you gainThe progress payment is not built from scratch at month end; a deduction error is caught on your desk before the employer’s check.

Checking the incoming progress payment

On the employer’s side, it compares the quantities in the contractor’s progress payment with the previous payment, with progress on the work programme and with site records; for lump-sum work it uses the percentage breakdown of the work. It records in a check note, with the basis, any item that exceeds the contract quantity, any item calling for a new unit rate, any advance recovery or penalty deducted short, and any missing document; it shows the cumulative amount as a share of the contract price. It drafts a letter to the contractor about missing documents or corrections, and reminds you when your own approval period is about to run out.

What you gainOverstated quantities and short deductions reach the supervising engineer before payment; the progress payment is settled within its period.

Variations and extension of time

It compares the cumulative progress payment and approved variations with the contract price, and tells you when variations approach the limit set in the contract. It picks up extension of time claims and requests for new unit rates in the correspondence; it shows the time left for a decision and whether the written notice period is running, and drafts the decision note and the reply letter. Interpreting the clause is for the legal agent; the decision is for the authorised body.

What you gainThe variation limit and an extension of time claim awaiting a reply reach your agenda before the decision period runs out.

Subcontractors

At the end of every week it sets out, for each subcontractor, the scope of work, progress, progress payments and payments, and missing documents. It flags a subcontractor whose social security notification for a period has not arrived before its progress payment is paid; it puts in front of you any gap that could create joint and several liability for you as the main employer. It drafts an instruction letter to the subcontractor when you ask for one.

What you gainYou know before a payment goes to a subcontractor with missing documents; liability does not come knocking later.

Use by industry

Every industry has its own progress payment headaches.

The same agent brings different work to the fore depending on which side of the project the company stands on. The messages below show what it might tell the project manager and the supervising engineer in common situations.

Road and infrastructure contractors

The index runs late; the payment doesn’t wait.

In road, water supply and sewer works, materials make up a large share; asphalt, pipe and steel prices change every month. The indices used for price adjustment are published after the payment period, and the series to be used for the labour input was redefined this year. When deductions are calculated by hand every month, an error is noticed only when the progress payment comes back from the employer.

AgentThis month’s progress payment draft is ready. Because the indices for the period have not been published yet, price adjustment was calculated with a provisional index and marked as such. Advance recovery and retention were deducted at the rates in the contract; one item with no unit rate in the contract was set aside as “unpriced”. The draft is with your quantity surveyor for approval.

Municipal technical works

The quantity has passed the contract.

In park, pavement and service building works the municipality is the employer: the supervising team examines the contractor’s progress payment and the authorising officer approves it. The files are crowded and the time for checking is limited; that an item’s cumulative quantity has passed the contract quantity is often understood only in the next progress payment.

AgentIn the contractor’s progress payment, the cumulative quantity of the interlocking paving item has passed the contract quantity; this item needs a variation or a new unit rate decision. Advance recovery was deducted below the contract rate; the correct amount is in the note with its basis. The check note and the draft correction letter to the contractor await your approval.

Factory and plant investment

The building is rising, and so is the budget.

An industrialist building a new production plant is the employer: civil works, steel structure and building services go to separate contractors, and the budget is set by the investment plan and the loan schedule. With material prices changing every month, a budget overrun often becomes clear only when the last progress payments arrive.

AgentThe plant project’s monthly cost status is ready. In the steel structure and building services items, actual cost is above the budgeted value of the work done; on this trend, cost at completion goes over budget. The item-by-item table and the basis of the forecast are attached; I suggest you review it with your investment committee.

Public building construction

The claim is in; the clock is running.

An authority commissioning a school, hospital or service building is the employer. The contractor’s extension of time claim arrives in writing and the time for a decision is limited; variations must also stay within the limit set in the contract. While the claim waits in the registry, the decision period can run out.

AgentThe contractor’s extension of time claim on weather grounds is unanswered, and more than half of the time left for a decision has passed. On the same job, cumulative variations are approaching the limit in the contract. Site reports and weather records are attached; the decision note and the draft reply await your approval. The decision is made by your authorised body.

Housing and urban renewal contractors

Many subcontractors, missing documents.

The contractor gives the shell, plastering, electrics and plumbing to separate subcontractors; each one’s progress payments, payments and documents are tracked separately. If a payment is made before the notification document for a period arrives, liability falls back on the contractor as the main employer.

AgentFor one of the subcontractor progress payments due this week, last month’s social security notification has not arrived yet; the subcontractor’s progress is in line with the work programme. The draft letter requesting the document awaits your approval; I suggest you look at it before the payment decision.

Mechanical and electrical contractors

Payment submitted, no approval.

A building services firm is often a subcontractor of the main contractor; it submits its progress payment to the main contractor, and approval is tied to the main contractor’s own progress payment. The longer approval is delayed, the less certain the payment date becomes, and the period in the contract is often in nobody’s calendar.

AgentThe progress payment you submitted to the main contractor has passed the approval period in your contract and is still not approved; the Cash Flow Agent has been notified. The draft reminder letter to the main contractor awaits your approval; the earlier correspondence and handover records are attached.

Trust and control

The agent prepares.
You sign.

Approval authority

The agent does not approve, sign or reject a progress payment; without the signature of the contractor’s authorised representative, or of the employer’s supervising team and authorising officer, a progress payment is not official. The agent writes no progress payment or payment record to the ERP and starts no movement of money; it does not change the work programme, the budget or the contract, and makes no decision on an extension of time or a variation. No letter goes to a contractor, an employer or a subcontractor on its own; remarks in correspondence such as “enter the quantity like this” or “don’t deduct the penalty” are not treated as business rules.

Audit trail

For every draft, its basis (quantity line, contract clause, previous progress payment), pre-check result, version, approver and sending date are kept on record. The signed record, the contractor’s notification and the agent’s forecast are labelled separately; where sources give different completion dates, the agent does not decide which is binding, it shows them all.

Your data stays with you

Runs on your own servers or on encrypted infrastructure. Each user sees only the projects they are authorised for; one contractor’s unit rates or progress payment never appear in a letter to another contractor. No personal data of subcontractor workers is processed, only the document status of each firm; under Türkiye’s personal data protection law (KVKK), the contact details of representatives are open only to the relevant roles.

Let your work programme and your progress payment read the same page.

In a demo built on your own work programme, quantity and progress payment records, let’s read the agent’s first project status table together.