Production and Operations Agent

Every shift accounted for, on your desk by morning.

At a time when demand is shifting from one product to another, it tracks output, downtime, maintenance and scrap by line and by shift, and tells you what is falling behind before anyone asks.

Is this stoppage a coincidence?

  1. Spots downtime: Notices that the line has stopped
  2. Reads cause: Reads the cause of the stoppage from the record and the messages
  3. Finds recurrence: Finds that the same machine has stopped before
  4. Alerts manager: Passes the finding to the plant manager

The current picture

Capacity sits idle; the shift log is full.

Demand is shifting from one product to another and the load on the lines is becoming uneven. On the shop floor, the evidence stays scattered across the shift log, the maintenance spreadsheet and the messages in the shift group.

Product film

Meet the Production and Operations Agent.

Watch, in a short film, how an unplanned stoppage is traced to a recurring fault and to the work orders waiting behind it.

The film is narrated in Turkish.

What the agent does

Six answers to “Why did the line stop?”, “Will this work order make it?” and “Which maintenance is overdue?”

Behind it, ERP and communication agents read the work orders, the downtime records and the fault messages in the shift groups; the inventory agent reports on materials, the sales agent on the date promised to the customer and the occupational health and safety agent on periodic inspections. You get a single production table by line and by shift.

Shift report, scrap and efficiency

Every morning, once the night shift has closed, it reports the previous day’s planned and actual output by line and by shift: good and defective units, downtime, overall equipment effectiveness (OEE) and the largest loss causes. At the start of every week it compares standard consumption in the bill of materials with actual consumption, and gives scrap, waste and rework as quantities by product and line, together with the items that deviate from standard. On a line with no defined cycle time it marks OEE as “incomplete”.

What you gainThe shift report reaches the morning meeting without being compiled by hand; a rise in the scrap rate is discussed in the week it happens.

Unplanned downtime

When a line or machine stops unexpectedly, when a downtime record is opened or when the stoppage is reported in the shift group, it tells you: which equipment, since when, for what reason and which work orders are waiting. If the reason code is empty it writes “no record” and shows the cause it inferred from the messages separately, labelled “inferred”. Clearing the fault and opening a maintenance work order are for the maintenance team.

What you gainYou learn why the line stopped while it is still down; a recurring fault reaches you before it turns into a major breakdown.

Overdue and postponed maintenance

Every morning it compares the time-based and usage-based preventive maintenance plan, by operating hours, mileage and cycle count, with the open maintenance work orders. It flags maintenance that is overdue or repeatedly postponed on critical equipment. If it sees production recorded on equipment that the occupational health and safety agent reports as past its periodic inspection, it alerts you and the safety team at the highest priority.

What you gainYou know every morning which machine has missed its maintenance; equipment taken out of service cannot be run unnoticed.

Work order due date

When a work order falls behind plan, when a material delay is reported or when its line has a stoppage, it recalculates the expected finish and compares it with the date promised to the customer. If the order will be late, it passes the production completion date to the sales agent and the consumption timing to the inventory agent, and sets out overtime, a line change or a change of priority as options.

What you gainYou know which order will miss its due date before the customer asks; the sales team talks to the customer while there is still time.

Capacity load and bottlenecks

At the start of every week it compares the work orders and the sales forecast for the coming weeks with line capacity, planned maintenance, holidays and the shift pattern. It shows the load by line and by week, the line that will become the bottleneck and the quantity that cannot be met, and presents an extra shift, subcontracting or resequencing as options.

What you gainYou see the bottleneck week before the order is confirmed; the line that will stand idle is in the same table.

Quality deviation

When the rejection rate at inspection crosses its threshold or a customer complaint arrives from the sales agent, it matches the nonconforming batch with its production conditions: line, shift, material lot. It points to the likely common factor; if the problem comes from a supplier lot, it notifies purchasing through the inventory agent. Placing the product on hold, stopping shipment or recalling it is the quality manager’s decision.

What you gainThe batch behind a complaint reaches your desk the same day, together with the line and the material it was produced with.

Use by industry

Every industry has its own production headaches.

The same agent brings different work to the fore depending on the plant and the facility. The messages below show what it might tell the plant manager and the facility manager in common situations.

Casting and machining

The machine is running; the parts aren’t keeping up.

On the machining line after casting, a CNC machine that has not stopped is assumed to be fine. Yet when the cycle time stretches, the line looks busy while the day’s output falls behind plan; the loss never shows up in the downtime record, it hides in the gap between units and time.

AgentYesterday’s shift report is ready. Downtime on the machining line was low, but OEE is low: the loss is in performance. Part cycle times are well above standard, most of all in the hours after a tool change. The summary by line and by shift is attached; I suggest you review tool life and cutting parameters with your production supervisor.

Plastic injection moulding

The mould changed; the scrap went up.

Several moulds are changed on the same press in a day; after each changeover, setup parts and flashed products go to scrap. When scrap is not reviewed weekly, which mould and which shift it rose on is noticed only when raw material consumption fails to add up.

AgentLast week’s scrap table is ready. Scrap on the cap mould is well above standard consumption; the increase is concentrated in the first hours after a mould change and on the night shift. The table by product, line and shift is attached; I suggest you review the setup instruction with your quality and production supervisors.

Automotive parts manufacturing

One line emptied; the other overflowed.

A parts supplier loads its lines to the vehicle manufacturer’s schedule. When one model slows and another speeds up, one line in the same plant stands waiting while an extra shift is discussed on the other; the bottleneck is often noticed in the week of shipment.

AgentThe load for the coming weeks is ready, based on the vehicle manufacturer’s latest schedule. The welding line that handles commercial vehicle parts goes over its capacity in the third week; the passenger car line is half loaded in the same weeks. The table by line and by week is attached; I suggest you review moving some work to the passenger car line, or an extra shift, with production planning.

Home appliances

The complaint comes from service; the cause from the line.

A fault first appears in an authorised service centre’s record. When quality, service and production records are kept apart, it takes a long time to see whether complaints from the same production week share a common cause.

AgentThree service complaints received from the sales agent have been traced to the same production week’s dishwasher batch; the rejection rate for pump-related defects at this batch’s inspection is also high. All the pumps in the batch come from the same supplier lot; the information has been passed to purchasing through the inventory agent. The decision on hold and shipment rests with your quality manager.

Switchgear and transformer manufacturing

The breakers haven’t arrived; the due date is close.

Every panel is designed and built to order; the site’s delivery date is written into the contract. A delay in a single circuit breaker or in busbar material holds a panel whose assembly is nearly finished at testing and dispatch.

AgentThe inventory agent reports that the circuit breakers expected for the hospital project’s main distribution panel will be late. As a result, the work order now finishes after the date promised to the customer. The production completion date has been passed to the sales agent; changing the assembly sequence and moving the test bay forward is one option, and the decision rests with your production planning.

Municipalities and water utilities

If the pump stops, the water stops.

In a municipality, service takes the place of production: a drinking water pumping station, a wastewater treatment plant, an asphalt plant, construction machinery and a vehicle fleet. Maintenance usually depends on operating hours or mileage; when meter readings are kept in separate spreadsheets, overdue maintenance is noticed only when a failure turns into a water outage or a stalled worksite.

AgentMaintenance on the standby pump at the pumping station has been postponed repeatedly and its operating hours have passed the maintenance limit; the duty pump has also failed twice this month. Maintenance status by equipment is attached; I suggest you review the maintenance schedule with your head of technical works.

Trust and control

The agent monitors.
You decide.

Decision authority

The agent only reads: it does not write work orders, production plans, maintenance plans or quality records, and sends no command to a machine, a line or a control system. It does not place a product on hold, stop a shipment or start a payment. Planning and priority decisions belong to production planning and the plant manager, maintenance decisions to the maintenance team and batch decisions to the quality manager; the agent’s options arrive as suggestions. It does not treat instructions in shift messages, such as “record the stoppage as planned”, as business rules; it takes the type of stoppage from the record.

Basis and audit trail

Every figure comes with its source: the production record, downtime record, inspection and maintenance plan it rests on are kept on record. The system record, the report in a shift message and the agent’s inference are labelled separately. Every notification to the safety team and to other agents is written to the audit log.

Your data stays with you

Runs on your own servers or on encrypted infrastructure. Each manager sees the data for their own facility, each shift supervisor the data for their own line. Downtime, scrap and quality deviations are tied to the line, the shift and the process; operator and technician names do not appear in alerts, and no individual performance score is produced. Raw machine data is not stored; only downtime and meter summaries are used.

When your line stops, be the first to know.

In a demo built on your own work order, downtime and maintenance records, let’s read the agent’s first shift report together.