Business agents
Inventory and Supply Chain Agent
Know what is on the shelf and what is on the way.
At a time when ships miss their schedules and cargo waits at borders and ports, it tracks every day how many days each item will last, when goods in transit will arrive and where outbound shipments are.
Where does the shortfall start?
- Reads delay: Takes the new arrival date of incoming goods
- Counts cover: Checks whether stock on hand lasts until that date
- Finds impact: Separates the orders and work orders that will run short
- Builds table: Presents what is affected, with options, in one table
The current picture
Ships run late; cargo waits at the gate.
Goods in transit do not arrive on the promised day, and outbound loads wait at the border or in port. The reorder point in the ERP, meanwhile, is often still set to the old lead time; the shortfall is noticed when the shelf is already empty.
On the Far East–Mediterranean trade, carriers are cutting capacity with blank sailings; freight rates are climbing again.
Drewry World Container Index · 19 November 2026
The agent’s answerImpact of a supply delayHalf of all container ships do not reach port on their scheduled day; a late ship arrives close to a week behind on average.
Sea-Intelligence, Global Liner Performance report · October 2026
The agent’s answerReorder signalSales of cars and light commercial vehicles in October fell by about a third on a year earlier.
Automotive Distributors’ and Mobility Association (ODMD), October 2026 market data · November 2026
The agent’s answerSlow-moving and near-expiry stockAt border gates, on Black Sea routes and in Mersin, where bonded warehouses are filling up, cargo is getting stuck on every route.
Bilgehan Engin, Chair of UTİKAD (Turkey’s international forwarding and logistics association), DIŞYÖNDER (Foreign Trade Executives Association) panel · November 2026
The agent’s answerShipment tracking
Product film
Meet the Inventory and Supply Chain Agent.
Watch, in a short film, how the orders and work orders hit by a delayed container are identified.
The film is narrated in Turkish.
What the agent does
Six answers to “How many days will this item last?”, “What does the delay affect?” and “Has the shipment left?”
Behind it, the ERP agent reads stock, movement and order records, and the communication agent reads carrier correspondence; the purchasing agent reports new delivery dates on purchase orders, the sales agent the sales forecast, the production agent the material requirements of work orders, and the profitability agent unit costs. Every morning you get a stock table showing days of cover, and a list of what each delay affects.
Daily stock position
Every morning it reports stock on hand, allocated and available by warehouse, together with goods in transit and expected receipt dates; from consumption, the sales forecast and work-order requirements it calculates each item’s days of cover and compares it with safety stock. Critical items that will run out before the lead time, or already have, go to the Early Warning and Risk Agent together with the linked orders and work orders. Quantities tie exactly to the ERP record; the calculation for an item with a short consumption history is labelled separately.
What you gainBefore the morning meeting you know how many days each item will last, and which one could stop a line or a site.
Reorder signal
When available stock plus stock in transit falls below the reorder point, or the sales forecast and work orders cannot be covered, it works out how much is needed and by when; the suggested quantity, required delivery date, reason and urgency go to the purchasing agent. If there is already an open requisition for the same item, it raises no new signal and adds a note to the existing one. At the start of every month it reviews actual lead times and changes in consumption, shows outdated reorder points and safety stock levels with the reasons, and proposes new ones.
What you gainWhen lead times lengthen, you see that the reorder point has to change too, before the stock runs out; no two requisitions are raised for the same need.
Impact of a supply delay
When the purchasing agent reports that a purchase order’s delivery date has slipped, or a port or freight delay is announced, it lists in one place the customer orders, work orders and site jobs the delay affects. Beside each it sets the options: transfer from another warehouse, substitute material, partial shipment. The list goes to sales, production and projects.
What you gainYou learn which customer and which line a delayed container concerns on the day the delay is announced.
Slow-moving and near-expiry stock
After each month-end close it lists, by warehouse and item, stock with no issues for a long time, and separately the batches nearing their expiry date that current consumption will not use up; it reports stock turnover. It values them at the unit cost from the profitability agent. For each it suggests a first step: sales priority, an inter-warehouse transfer, a return to the supplier or the disposal process.
What you gainGoods quietly ageing in the warehouse and batches about to expire reach you while they can still be sold.
Stock count variance
When count results are entered, when negative stock appears in the ERP or when the quantity at goods receipt does not match the dispatch note, it examines the variance by item and warehouse and states the likely cause: unposted consumption, receipt into the wrong warehouse, a unit-of-measure error, wastage. It notes the variance and its cause for accounting, and flags variances that recur on the same item separately.
What you gainA count variance is discussed together with where it came from, before it turns into a year-end adjusting entry.
Shipment tracking
Every morning it checks the day’s planned shipments against the e-İrsaliye (Turkey’s electronic dispatch note), carrier information and proof of delivery; it separates shipments that left late, are stuck on the road or have no proof of delivery. It follows port, customs and border-gate announcements and passes the affected customer orders to sales. A carrier’s “delivered” message is held as a notification until the dispatch note response or proof of delivery arrives.
What you gainYou know a shipment is stuck before the customer calls, and your sales team talks about the promised date on that basis.
Use by industry
Every industry has its own stock headaches.
The same agent brings different work to the fore depending on the business model. The messages below show what it might tell the supply chain manager and the warehouse supervisor in common situations.
Pharmaceutical and medical distribution
Many batches, close dates.
Pharmaceutical wholesalers and medical product distributors hold thousands of lines by batch and expiry date; some travel in the cold chain. One warehouse may have run out of a product while a batch of the same product in another is about to expire; both are often noticed only at month end.
AgentThis month’s stock ageing list is ready. Four batches are nearing their expiry date and current consumption will not use them up; for two of them, the same product is about to run out in your other warehouse. I suggest an inter-warehouse transfer for those two batches and sales priority for the other two. The batches and their dates are attached.
Electronics importer and distributor
The container slipped; orders are waiting.
A distributor importing electronic components and finished products brings most of its goods from the Far East by container, and sells the same products to dealers, project customers and its own online channel. When a ship’s schedule slips, which dealer and which project order will have to wait often becomes clear only when the goods fail to enter the bonded warehouse.
AgentAccording to the purchasing agent, the container of power supplies and driver boards will now arrive at the start of next month because of a blank sailing. Stock on hand lasts until the middle of next week; after that, orders from two dealers and one project customer cannot be filled. A partial shipment option from stock in your other warehouse and substitute products are attached; the impact list has gone to sales. The decision on which order is filled first is yours.
Cosmetics and personal care
The boxes left; no proof of delivery.
Products go to supermarket chains’ regional distribution centres, to pharmacies and to online customers through different carriers. A distribution centre can turn away a truck that misses its delivery slot, and a carrier’s “delivered” message and the buyer’s goods receipt do not always show the same day.
AgentTwo of yesterday’s shipments did not leave the warehouse at the planned time; one came back because it missed its slot at the supermarket chain’s regional distribution centre. For one shipment the carrier wrote “delivered”, but the buyer’s dispatch note response has not arrived yet; I have not counted it as delivered. The affected orders have gone to sales.
Power plants and maintenance
Rarely used, critical when missing.
In power plants and large facilities, spare parts are used only a few times a year, but a missing one stops a turbine or a line. These items are not sold; the need comes from consumption history and the planned maintenance schedule. The reorder point in the ERP is often still the one entered when the plant was commissioned.
AgentThis month’s parameter proposals are ready. For two critical spare parts used in turbine maintenance, the actual lead time is well above the one defined in the ERP; as it stands, the reorder point would let the stock run out before the part arrives. The proposed reorder point and safety stock, with the reasoning, are attached; I suggest you review the change with your maintenance planner.
Public institution storehouse
The count must match the records.
In Turkish public institutions, consumables are tracked in movable property records; the storehouse is counted at year end and the count is compared with the records. Issues to departments that were never posted, or units mixed up between boxes and pieces, come back as count variances.
AgentThe storehouse count results have been compared with the movable property records. Three items show a variance: in two, issues to departments appear not to have been posted; in one, the receipt was recorded in boxes and the issue in pieces. The variances and their likely causes are ready for your movable property records and control officer; any correcting entry is made on that officer’s decision.
Trust and control
The agent alerts you.
You place the order.
Decision authority
The agent only reads: it writes to no stock, transfer, reservation, count or planning parameter record; it raises no purchase requisition or order and starts no payment. On the purchasing side, a reorder signal becomes a requisition through your company’s approval workflow; transfers, parameter changes and shipping decisions belong to the authorised person. When stock is short, it never puts one customer’s order ahead of another on its own; it sets the options in front of you.
Basis and audit trail
Every stock figure is tied to its ERP record and the date of its last movement; days of cover, the date stock will run out and the cause of a count variance are labelled as calculated. A date given by a carrier or supplier in correspondence counts as a notification and is corrected once the dispatch note and goods receipt record arrive; instructions in correspondence such as “please confirm delivery” never replace a business rule. Which signal went to whom, and on what basis, stays on record.
Your data stays with you
Runs on your own servers or on encrypted infrastructure. A warehouse supervisor sees their own warehouse, a site manager the materials for their own site. A count variance is tied to the item, the warehouse and the process, and is never reported by a person’s name; carriers’ and drivers’ contact details are used only for shipment tracking.
Hear about it before the shelf is empty.
In a demo built on your own stock, order and shipment data, let’s read the agent’s first stock table together.